TYPE OF INSTALLATION
|
CHE-PHY
|
BIOLOGICAL
|
General purifying yield |
~50%
|
> 90%
|
COD/BOD Reduction |
50-60%
|
90-95%
|
Color Elimination |
Yes
|
Yes > 90%
|
Ammonia Elimination |
No
|
Yes >95%
|
Nitrogen Elimination Total |
~30%
|
>95%
|
Phenol Elimination |
No
|
>90%
|
Final Salinity With Respect Water To be purified |
Higher then input
|
Same as Input
|
Sludge produced per m3 of Effluent Treatment |
6 kg
|
0.1-0.2 kg
|
Sludge produced per Kg of COD |
1.8 kg
|
0.2 kg
|
Sludge character |
Toxic
|
Non-Toxic
|
Sludge disposal |
Very Difficult
|
Very-Easy
|
Running cost per m3 of Effluent Treatment |
TK.25.0-30.0/-
|
TK.3.5-4.0/-
|
Initial cost (Chemical-Physical Base 100) |
100
|
200/220
|
Space Occupied For 1000 m3 /day |
300-350m3
|
At least 600 m3
|
Reliability |
30%
|
80%
|
Possibility Fish Life Directly In Purified H20 |
No
|
Yes
|
Possibility Reuse of Purified Water for Irrigation |
No
|
Yes
|
Compliance With European Laws (very strict) |
No
|
Yes all
|
Produced of bad smell |
Yes
|
No
|
Treatment Quality |
Improper, Bangladesh Standard
|
Proper, European Standard
|
No comments:
Post a Comment